SYSTEM TYPE REQUIRED: |
|
|
|
|
|
|
ELECTRICAL
REQUIREMENTS: |
|
|
|
|
|
|
FLOW DEMAND: |
|
|
• |
Total Peak
Load: |
GPM |
|
|
For assistance
in calculating Total
Peak
Load, Click Here
|
|
|
|
|
|
|
SYSTEM PRESSURE REQUIRED: |
|
|
• |
Building Elevation:
(Vertical
Distance from Unit floor level to top fixture) |
FT. |
|
• |
Top Floor Pressure Required:
(Based on fixture
requirements; Approx 25-35 PSI) |
PSI |
|
• |
Calculated System Friction Loss:
(DO NOT Include
Pipe Friction Loss between Hydrant and Unit Suction) |
PSI |
|
|
|
|
|
STREET PRESSURE: |
|
|
• |
DATE RECORDED (mm/dd/yyyy): |
|
|
• |
Minimum / Residual: PSI,
flowing GPM |
|
|
• |
Maximum / Static: PSI |
|
|
|
|
|
|
SUCTION PRESSURE LOSSES: |
|
|
• |
Hydrant / Unit Suction
Elevation:
(Vertical
Distance from Hydrant to Unit Suction) (+ or -) |
FT. |
|
• |
Friction Loss: (Between Hydrant
and Unit) |
PSI |
|
• |
Back Flow Preventer Friction
Loss: (Approximately 5-8 PSI) |
PSI |
|
• |
Water Meter Friction Loss:
(Approximately 5 PSI) |
PSI |